Transformers, switchboards, cables and ASIC mining hardware — the full electrical backbone for Bitcoin and proof-of-work mining sites.
One partner for every link — transformers, switchboards and cable, coordinated and certified.
Mining sites live and die on power density and uptime. Evenson Power delivers the complete mining power chain — substation and pad-mounted transformers, UL 891 switchboards, heavy feeder cable, and air- or hydro-cooled ASIC miners and containers — sourced and supported through EP Group.
From behind-the-meter generation to grid-connected farms, the electrical backbone determines how many machines you can run and how reliably. Evenson Power supplies and coordinates every link, so operators can scale capacity without juggling multiple vendors.
Unlike intermittent commercial loads, mining draws near-constant full load around the clock. The power chain must be rated for sustained operation: transformers with thermal margin, switchboards rated for high continuous current and the fault level of a stiff supply, and feeder cable sized for heat rather than just nominal ampacity. Evenson Power specifies all three for continuous duty, the way a profitable mine actually runs.


Mining economics often hinge on power source — grid, behind-the-meter generation, or stranded and flared gas. Each scenario changes the transformer, protection and switching requirements. Evenson Power configures the power chain for the source you have, and pairs it with air- or hydro-cooled ASIC hardware and containers to match the climate and density of your site.

Use the BTC mining configurator to plan capacity, then let Evenson Power deliver the transformers, switchboards, cable and miners as a coordinated package through EP Group. Single-source supply means fewer interfaces, faster energization and one team accountable for the whole electrical build — so you can focus on hashrate, not procurement.
Even at aggressive timelines, mining sites must meet UL, NEC and IEC requirements for safety and insurability. Evenson Power supplies certified, documented equipment with the test reports and nameplate data inspectors expect, helping operators scale quickly without cutting corners on compliance.
Whatever you are building, the fastest path is a conversation about the actual load, site and schedule. Evenson Power pairs the breadth of a full power-chain catalog with engineers who specify it every day, and the global sourcing of EP Group behind every order. Send your one-line or requirements and we will return a coordinated, certified proposal — transformers, switchboards and cable — built to your standards and timeline.
In mining, electricity is the dominant cost, so the power chain is engineered to minimize losses and downtime. Efficient transformers, correctly sized conductors and reliable switching protect your margin over years of continuous operation. Evenson Power specifies for the duty cycle a mine actually runs and pairs it with cooling-appropriate ASIC hardware, so every megawatt you pay for reaches the machines.
Containerized and modular builds let operators add capacity in repeatable blocks. Evenson Power supplies the transformers, switchboards and cable that power each block alongside the containers themselves, so expansion is a matter of replicating a proven unit rather than redesigning the electrical system. That repeatability speeds permitting, procurement and energization.
Downtime erases mining profit, so the electrical backbone must be reliable end to end. Sourcing the transformer, switchboard, cable and ASIC hardware from one partner means the ratings are coordinated, the protection is correct, and there is one team accountable when you scale or troubleshoot. Evenson Power delivers that single-source supply through EP Group, configured for grid, behind-the-meter or stranded-gas power, and matched to air- or hydro-cooled hardware — so operators can grow hashrate with confidence rather than juggling vendors.
Mining is a race against difficulty and energy cost, and procurement delays directly reduce return. Evenson Power structures supply to keep pace — blending in-stock transformers and switchboards with made-to-order manufacturing, and drawing on EP Group’s global sourcing to secure components even when supply is tight. Operators can phase capacity in repeatable, containerized blocks, replicating a proven electrical package rather than redesigning each expansion. Paired with air- and hydro-cooled ASIC hardware matched to the site, this lets a mine scale hashrate predictably, with one partner accountable for the whole electrical build from the service entrance to the racks.
The complete power chain — transformers, UL 891 switchboards and cable — engineered, certified and delivered as one.
Request a Quote